The work on Phase two of the Colonnade ( the intermediate/advanace freeride part) is coming along great. It’s good to see so many riders down there digging and throwing dirt on a Saturday in January. Riding too! A builder has got to test the dirt’s durability. A Seattle Area rider wandering on down can easily find a way to get involved. Come join in the work and burn away tons of man hours and all that winter fat. Mike is running a very positive operation and work is getting down quickly. Check out the official BBTC.org site.
| Trail Building is like state work, but only better. | |
| The dirt is more durable, than Andy | |
| Andy getting the play back. |
More of these photos in the gallery.




mark brent
BonesXMetal
jayp
Face